
- Home
- Industries
- Special Vehicles / Motorhomes
Operations consulting for special vehicle builders and motorhome manufacturers
High individuality meets a chassis you do not control and fixed delivery dates. We increase plant output and strengthen the supplier network, even at batch size one.
What it is about right now
The boom was followed by record stock levels, discounts and production stops. Motorhomes are holding at a high level, but the growth is over, and production has to align with real demand. For emergency and service vehicles it is the other way round: full order books, long lead times and fixed prices over years. In both cases, operations decides the result.
As of 2025: 75,368 newly registered motorhomes in Germany, almost at the previous year's level. Source: CIVD
Chassis scheduling
The most expensive part comes from the OEM. Missing chassis block the line, too many tie up capital.
Variant diversity at batch size one
Carry floor plans, options and specifications cleanly through to the bill of materials and routing.
Weight and payload
Every optional extra reduces the payload, so weight has to be managed as early as design and purchasing.
Rework and lead time
Missing parts, water tightness, electrics and gas as typical drivers of rework and warranty costs.
What we take on in special vehicle building
Operational Excellence / Production
Assembly organisation, takt instead of workshop, missing-parts management, lead time.
View serviceSupply Chain / Procurement
Chassis scheduling, sales and operations planning with dealers (S&OP), supplier development, price adjustment clauses.
View serviceQuality Management
In-process inspection instead of final inspection only, weighing at end of line.
View serviceProject Management
New model ranges, model year changes and changes of base vehicle.
View service
When companies bring us in
- Stock has to be reduced and planning reset.
- A base vehicle becomes scarce or a second platform is added.
- Rework and warranty rates are rising.
- A large public fixed-price order needs project control.
Other industries
All industriesWhich issues are keeping your plant busy right now?
Briefly describe your situation. We will arrange a one-hour intro meeting, at your site or by video.

The owner joins every intro meeting.
- A personal reply from us
- One hour on your situation
- You decide whether to continue
Request an intro meeting
No obligation, in confidence.






